I.S Machine Section Exchange

Covington, Atlanta I.S Machine Mechanism Removal, Repair & Replacement

JB Engineering Services carried out an I.S Machine Section Exchange and I.S Machine Mechanism Removal, Repair & Replacement.

Our skilled engineers carried out an 8 section box exchange and; replaced all pipework for compressed air, contant cushioning and Lincoln lubrication lines. In addition to this planned installation, we removed all blowhead and baffle mechanisms on the 8 section I.S machine.

All client objectives were completed on time within 14 days. Our engineers worked in a tough, humid and noisy environment over 12 hour days to ensure this project was completed properly with the additional job getting done too.

Scope as follows:

  • Prepare tool and specialised lifting equipment, carry out detailed assessment on our procedures and identify any potential hazards to consider and eliminate.
  • Unwrap new section boxes and materials, remove blowhead, baffle and takeout Mechanisms aswell as the 21 way valve block ready for transportation and fitting.
  • Isolation of L12 Machine disconnection of all air, electrical and fluid services.
  • Removal of the I.S Machine conveyor – to be overhauled and modified within the workshop.
  • Removal of the existing section boxes.
  • Cleaning and preparation of the existing machine.
  • Modifications and installations of new manifold to blow and blankside.
  • Controlled installation of new Section boxes.
  • Installation of Mechanisms to all sections.
  • The manufacture of all solid pipework to all sections for main air, pilot air, constant cushioning and Lincoln lubrication systems.
  • The installation of refurbished machine conveyor.
  • The reconnection of other air services for mould and conveyor cooling.
  • Cold start up of the I.S Machine and testing of operation.
  • Machine started in full production.