Leading glass packaging manufacturer, Beatson Clark, tasks us with installing and replacing specialist production equipment within their factory.
Project Requirements
Our turnkey service included replacing:
- An 8 section 5 1/2 I.S Machine
- An Annealing Lehr
- A 200kw Mould cooling fan
- All relative Air, fluid and Electrical services to all systems
JB Engineering acted as the principal contractor on behalf of the client, taking full responsibility and control for all aspects of the projects.
What We Achieved
The Project was completed 7 days before the customer request date. The client experienced an efficient start-up with no snagging points. We achieved our proposed works with zero accidents, incidents or near misses. And, as expected, the customer was highly satisfied with our work. JB EMC brought this in on budget, with no additional or unforeseen activities to incur additional costs.
Each task was carried out by highly qualified, disciplined electrical and mechanical engineers, adhering to strict risk assessments and methods. Our team are fully inducted under the CDM criteria and client in house rules and attained no complaints or concerns from the client or HSE. Vigorous testing procedures for Covid were undertaken, with no instances of infection. Our meticulous approach meant that this assignment came in on time, within budget and produced extremely positive results for our client.